Enter your phone number below and we will call you back in next few minutes
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
CALL: (800) 614-9620
Follow Us
StoPanel Projects

The following projects were built stronger, faster utilizing StoPanel technology.

Saving Time and Money Restoring an Atlanta area Landmark

Built in 1963, 309 East Paces is located in the trendy Buckhead area of Atlanta and was once the headquarters of the nationwide rental company Aaron’s. The owners of the 12-story building, Knox/Redan, wanted to preserve the building’s aesthetics, selecting a brick design with large industrial-style windows.

Continue Reading...

Inspira Medical Center Adds Two Floors in “Unbelievable” Time Frame

When Inspira Medical Center of Vineland, NJ, wanted to add two floors to its acute care building, they set some ambitious goals. Specifically, they needed to match the design theme of the existing single-story structure. And they were looking for a quick solution, even though it was the beginning of winter.

Continue Reading...

Rowan University Accelerates Project Timeline to Meet Student Needs

Rowan University in Glassboro, NJ, was growing rapidly, blossoming in  just a few years from a state teachers’ college to a full university with a
graduate program and 18,000 students. The university, located in the suburbs of Philadelphia, needed student housing quickly.

Continue Reading...

Aloft and Element Hotels Share a Building and Panelization Benefits

Two hotel brands – Aloft and Element – share a single 33-story tower in the popular 6th Street entertainment district of Austin, TX. The two hotels weren’t planning to use panelization technology, but they were seeking a unique look. Time was short; winter was coming. And they realized the site offered little space for a work area

Continue Reading...

Le Meridien and AC Hotels Find an Easier Way to Build

The first collaboration from the Marriott and Starwood merger, the dual-branded Le Meridien and AC Hotels bring a European flavor to Denver. Located in the heart of the city’s downtown, the site offered limited access and no opportunity to close street sto traffic. A panelized approach using StoPanel® Technology was the only way to go.

Continue Reading...
Multi-unit Student Housing Project JPC RowanMayfair Renaissance Atlanta, GAChildren's Hospital of Philadelphiaaloft/ Element hotel1400 Hiline
Hilton Garden Inn Silver Slipper Casino109 King Street EastHub Plus Purdue

Ready to get started?

Mammoth's team is looking forward to making the process simple. Contact us for a quote.

Contact Us
Vertically Integrated
Safety Focused
Collaborative Support Network
Advanced Manufacturing & Stored Billing

“We’re very excited to be turning over the first completed space to Westfield. Despite some unforeseen changes and general surprises associated with a remodel, we did not have to push occupancy.”

// Senior Project Manager, Gilbane

“We’re very excited to be turning over the first completed space to Westfield. Despite some unforeseen changes and general surprises associated with a remodel, we did not have to push occupancy.”

// Senior Project Manager, Gilbane
Contact Us
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
1360 Norton Road, Columbus, Ohio 43228
Phone Number:(800) 614-9620
Email:info@mammothprefab.com